Thermal Treatment of Eight CVOC Source Zones to Near Nondetect Concentrations

In situ thermal desorption (ISTD) was used for the treatment of eight separate source zones containing chlorinated solvents in a tight loess (silt/clay) above the water table. The source areas were as much as 365 m (1200 feet) apart. A target volume of 38,200 m³ (49,950 cubic yards) of subsurface ma...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Ground water monitoring & remediation 2009-06, Vol.29 (3), p.56-65
Hauptverfasser: Heron, Gorm, Parker, Ken, Galligan, Jim, Holmes, Thomas C.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In situ thermal desorption (ISTD) was used for the treatment of eight separate source zones containing chlorinated solvents in a tight loess (silt/clay) above the water table. The source areas were as much as 365 m (1200 feet) apart. A target volume of 38,200 m³ (49,950 cubic yards) of subsurface material to a depth of 9.1 m (30 feet) was treated in a period of 177 days. Energy was delivered through 367 thermal conduction heater borings, and vapors were extracted from 68 vertical vacuum wells. A vapor extraction and capture system, including a surface cover and vertical vacuum wells next to heater borings, provided for effective pneumatic control and capture of the chlorinated volatile organic compound (CVOC) vapors. A central treatment system, based on condensation and granular activated carbon filtration, was used to treat the vapors. Approximately 5675 kg (12,500 pounds) of contaminants was recovered in the extracted vapors. Forty-seven soil samples were used to document remedial performance. Based on these, the concentrations of the target contaminants were reduced to below the target remedial goals in all eight areas, typically with concentrations below 0.01 mg/kg in locations that had had CVOC concentrations higher than 1000 mg/kg. Turn-key costs for the thermal remediation were $3.9 million, and the unit treatment cost, including all utilities, was $103 per cubic meter treated ($79 per cubic yard).
ISSN:1069-3629
1745-6592