Validation of service life performance of in situ concrete by TEM and RCM measurements
This paper presents a study of non-destructive production control testing and service life achievement of cast in situ parts of the Green Heart Tunnel. Production control was performed by resistivity measurements using the Two Electrode Method (TEM). Validation consisted of measurements on cores tak...
Gespeichert in:
Veröffentlicht in: | Heron 2007-01, Vol.52 (4), p.225-238 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper presents a study of non-destructive production control testing and service life achievement of cast in situ parts of the Green Heart Tunnel. Production control was performed by resistivity measurements using the Two Electrode Method (TEM). Validation consisted of measurements on cores taken after one to three years on site, which were tested using the Rapid Chloride Migration method. The results show that quality control by resistivity testing as carried out in this project was successful. |
---|---|
ISSN: | 0046-7316 |