Key technical problems of extra-high concrete faced rock-fill dam

This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete faced rock-fill dams. This paper has raised the key technical problems which need t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Science in China Series E: Technological Sciences 2007-10, Vol.50 (S1), p.20-33
Hauptverfasser: Ma, HongQi, Cao, KeMing
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete faced rock-fill dams. This paper has raised the key technical problems which need to study for construction of 300 m-height-scale concrete faced rock-fill dams based on the main experiences on the extra-high concrete faced rock-fill dams built after the year of 2000.
ISSN:1006-9321
1862-281X
DOI:10.1007/s11431-007-6007-5