A tabu search heuristic for the quay crane scheduling problem

This paper proposes a tabu search heuristic for the Quay Crane Scheduling Problem (QCSP), the problem of scheduling a fixed number of quay cranes in order to load and unload containers into and from a ship. The optimality criterion considered is the minimum completion time. Precedence and non-simult...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of scheduling 2007-10, Vol.10 (4-5), p.327-336
Hauptverfasser: Sammarra, Marcello, Cordeau, Jean-François, Laporte, Gilbert, Monaco, M. Flavia
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper proposes a tabu search heuristic for the Quay Crane Scheduling Problem (QCSP), the problem of scheduling a fixed number of quay cranes in order to load and unload containers into and from a ship. The optimality criterion considered is the minimum completion time. Precedence and non-simultaneity constraints between tasks are taken into account. The former originate from the different kind of operations that each crane has to perform; the latter are needed in order to avoid interferences between the cranes. The QCSP is decomposed into a routing problem and a scheduling problem. The routing problem is solved by a tabu search heuristic, while a local search technique is used to generate the solution of the scheduling problem. This is done by minimizing the longest path length in a disjunctive graph. The effectiveness of our algorithm is assessed by comparing it to a branch-and-cut algorithm and to a Greedy Randomized Adaptive Search Procedure (GRASP). [PUBLICATION ABSTRACT]
ISSN:1094-6136
1099-1425
DOI:10.1007/s10951-007-0029-5