A tabu search heuristic for the quay crane scheduling problem
This paper proposes a tabu search heuristic for the Quay Crane Scheduling Problem (QCSP), the problem of scheduling a fixed number of quay cranes in order to load and unload containers into and from a ship. The optimality criterion considered is the minimum completion time. Precedence and non-simult...
Gespeichert in:
Veröffentlicht in: | Journal of scheduling 2007-10, Vol.10 (4-5), p.327-336 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper proposes a tabu search heuristic for the Quay Crane Scheduling Problem (QCSP), the problem of scheduling a fixed number of quay cranes in order to load and unload containers into and from a ship. The optimality criterion considered is the minimum completion time. Precedence and non-simultaneity constraints between tasks are taken into account. The former originate from the different kind of operations that each crane has to perform; the latter are needed in order to avoid interferences between the cranes. The QCSP is decomposed into a routing problem and a scheduling problem. The routing problem is solved by a tabu search heuristic, while a local search technique is used to generate the solution of the scheduling problem. This is done by minimizing the longest path length in a disjunctive graph. The effectiveness of our algorithm is assessed by comparing it to a branch-and-cut algorithm and to a Greedy Randomized Adaptive Search Procedure (GRASP). [PUBLICATION ABSTRACT] |
---|---|
ISSN: | 1094-6136 1099-1425 |
DOI: | 10.1007/s10951-007-0029-5 |