Poor water quality in Loch Leven (Scotland) in 1995 in spite of reduced phosphorus loadings since 1985 : the influences of catchment management and inter-annual weather variation

Eight tonnes of phosphorus in all forms (total phosphorus, TP) entered Loch Leven from its catchment in 1995, compared to 20 t in 1985. Diffuse run-off from the land, and waste from over-wintering geese contributed 59% of the total loading in 1995 cf. 42% in 1985. Point-sources of sewage, and waste-...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Hydrobiologia 1999-05, Vol.403, p.135-151
Hauptverfasser: BAILEY-WATTS, A. E, KIRIKA, A
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Eight tonnes of phosphorus in all forms (total phosphorus, TP) entered Loch Leven from its catchment in 1995, compared to 20 t in 1985. Diffuse run-off from the land, and waste from over-wintering geese contributed 59% of the total loading in 1995 cf. 42% in 1985. Point-sources of sewage, and waste-water from fish-rearing ponds, produced the rest. Inputs of phosphorus in soluble reactive form (SRP) totalled 5 t, i.e. 63% of the TP loading in 1995, as compared with 1985 values of 11.8 t and 59%. Point-sources of SRP contributed 54% of the total SRP input in 1995 cf. 69% in 1985. Loadings from three sewage treatment works (STW) totalled 3.1 t TP in 1995 as compared with 5.3 t in 1985; this included 2.6 t SRP (cf. 3.6 t). Daily per capita outputs of the upgraded Kinross North and Milnathort STWs were 0.68 g and 0.81 g TP, respectively, compared with pre-upgrade values of 1.77 g and 2.03 g. Nett reductions in TP and SRP loadings between 1985 and 1995, are 55% and 59% respectively. These values are attributable as much to the lower rainfall of 890 mm over the period of study in 1995, compared to 1250 mm in 1985, as to `managed' elimination of P usage at a major industrial source, and upgrades of STWs. In spite of these cutbacks, a combination of the lower rainfall and an extraordinarily hot summer in 1995 negated the expected reduction in lake phosphorus and chlorophyll levels. The lowered specific areal loading of ca. 0.7 g P m super(-2) estimated for 1995 still considerably exceeds the ideal maximum for the loch. These statistics nevertheless ignore the significance of a reduction of ca. 7 t in P entering the system in bio-available form, a recently completed upgrade of a major STW and channelling of effluent from a small works out of the catchment.
ISSN:0018-8158
1573-5117
DOI:10.1023/A:1003758713050