An exact approach to early/tardy scheduling with release dates

In this paper, we consider the single machine earliness/tardiness scheduling problem with different release dates and no unforced idle time. The problem is decomposed into weighted earliness and weighted tardiness subproblems. Lower bounding procedures are proposed for each of these subproblems, and...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Computers & operations research 2005-11, Vol.32 (11), p.2905-2917
Hauptverfasser: Valente, Jorge M.S., Alves, Rui A.F.S.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this paper, we consider the single machine earliness/tardiness scheduling problem with different release dates and no unforced idle time. The problem is decomposed into weighted earliness and weighted tardiness subproblems. Lower bounding procedures are proposed for each of these subproblems, and the lower bound for the original problem is the sum of the lower bounds for the two subproblems. The lower bounds and several versions of a branch-and-bound algorithm are then tested on a set of randomly generated problems, and instances with up to 30 jobs are solved to optimality. To the best of our knowledge, this is the first exact approach for the early/tardy scheduling problem with release dates and no unforced idle time.
ISSN:0305-0548
1873-765X
0305-0548
DOI:10.1016/j.cor.2004.04.016