Wind pneumatic accumulation storage system innovation
By building up of laboratorial model was gained conditions for realization operation experiments, with aim gaining data for appointing operation-technical characteristic and relevant parameter definition, needed for evaluation and dimension of proposed devices. In increasing of conversion process it...
Gespeichert in:
Veröffentlicht in: | Metalurgija 2006-07, Vol.45 (3), p.262-262 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | By building up of laboratorial model was gained conditions for realization operation experiments, with aim gaining data for appointing operation-technical characteristic and relevant parameter definition, needed for evaluation and dimension of proposed devices. In increasing of conversion process it can be perspective compensate air as a working medium for liquid (water), which is able use energy momentum effectively to suitable dimensioned turbine blades. Other suitable solution could be jump electro generation part and operate it in parallel mode with heat electro unit, as supplying pressed air for gaseous, solid, liquid fuel burning. |
---|---|
ISSN: | 0543-5846 |