Risk Based Optimization of the Life Assessment for Fossil Power Plant
As a number of aged fossil power plants recently increased, the precise life assessment of critical equipments gets to be important more than ever. Despite of infrequent likelihood of failure, the equipments in high pressure and temperature operation condition have traditionally been considered as c...
Gespeichert in:
Veröffentlicht in: | Key engineering materials 2006-01, Vol.321-323, p.1572-1575 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | As a number of aged fossil power plants recently increased, the precise life assessment of
critical equipments gets to be important more than ever. Despite of infrequent likelihood of failure,
the equipments in high pressure and temperature operation condition have traditionally been
considered as critical because of huge consequence of the equipments and hence life assessment of
fossil power plant has been focused on all of the severe operated equipments for past decades.
Nowadays, with Risk-Based Inspection technology being developed rapidly, most of the power plant
utilities get a chance to reduce the scope of the inspection and test and to extend the interval for the
life assessment. This paper provides methodology based on Risk-Based Inspection technology to
optimize the life assessment work scope and interval and also demonstrates the enhanced life
assessment procedure including risk assessment of equipments. |
---|---|
ISSN: | 1013-9826 1662-9795 1662-9795 |
DOI: | 10.4028/www.scientific.net/KEM.321-323.1572 |