Factors to consider when upgrading transfer switching equipment to present codes and standards

Some of the steps that should be considered when expanding or replacing equipment in emergency and standby power systems are discussed. The need for code conformance, reliable operation, and safety to personnel is discussed. For a better understanding, derived systems, ground-fault sensing, the impa...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on industry applications 1993-05, Vol.29 (3), p.510-514
Hauptverfasser: Castenschiold, R., Hogrebe, L.F.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Some of the steps that should be considered when expanding or replacing equipment in emergency and standby power systems are discussed. The need for code conformance, reliable operation, and safety to personnel is discussed. For a better understanding, derived systems, ground-fault sensing, the impact of NEC (National Electrical Code) changes on yesterday's and today's installations, and the limited degree of isolation provided by three-pole transfer switches are reviewed.< >
ISSN:0093-9994
1939-9367
DOI:10.1109/28.222419