Operator work load: when is enough enough?

Three measures of operator mental work load were tested with a large, interactive computer system. Two—operator rating of time stress, and the ratio of the time required to time allowed for each subtask—proved to be significant and easy to use.

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Communications of the ACM 1986-07, Vol.29 (7), p.638-642
Hauptverfasser: LEMAY, M, HIRD, E
Format: Magazinearticle
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Three measures of operator mental work load were tested with a large, interactive computer system. Two—operator rating of time stress, and the ratio of the time required to time allowed for each subtask—proved to be significant and easy to use.
ISSN:0001-0782
1557-7317
DOI:10.1145/6138.6147