Operator work load: when is enough enough?
Three measures of operator mental work load were tested with a large, interactive computer system. Two—operator rating of time stress, and the ratio of the time required to time allowed for each subtask—proved to be significant and easy to use.
Gespeichert in:
Veröffentlicht in: | Communications of the ACM 1986-07, Vol.29 (7), p.638-642 |
---|---|
Hauptverfasser: | , |
Format: | Magazinearticle |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Three measures of operator mental work load were tested with a large, interactive computer system. Two—operator rating of time stress, and the ratio of the time required to time allowed for each subtask—proved to be significant and easy to use. |
---|---|
ISSN: | 0001-0782 1557-7317 |
DOI: | 10.1145/6138.6147 |