A shortest route formulation of simple U-type assembly line balancing problem
In this paper, a shortest route formulation of simple U-type assembly line balancing (SULB) problem is presented and illustrated on a numerical example. This model is based on the shortest route model developed in [Manage. Sci. 11 (2) (1964) 308.] for the traditional single model assembly line balan...
Gespeichert in:
Veröffentlicht in: | Applied mathematical modelling 2005-04, Vol.29 (4), p.373-380 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In this paper, a shortest route formulation of simple U-type assembly line balancing (SULB) problem is presented and illustrated on a numerical example. This model is based on the shortest route model developed in [Manage. Sci. 11 (2) (1964) 308.] for the traditional single model assembly line balancing problem. |
---|---|
ISSN: | 0307-904X |
DOI: | 10.1016/j.apm.2004.10.003 |