Application of transmission reliability assessment in probabilistic planning of BC Hydro Vancouver South Metro system

This paper presents a basic method of probabilistic transmission planning used in BC Hydro. The method is based on transmission system reliability evaluation and an overall economic analysis including damage cost due to system unreliability. Four alternatives for the Vancouver South Metro system of...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE Transactions on Power Systems 1995-05, Vol.10 (2), p.964-970
Hauptverfasser: Li, W., Mansour, Y., Korczynski, J.K., Mills, B.J.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper presents a basic method of probabilistic transmission planning used in BC Hydro. The method is based on transmission system reliability evaluation and an overall economic analysis including damage cost due to system unreliability. Four alternatives for the Vancouver South Metro system of BC Hydro have been evaluated using the method: the first one is addition of a 230 kV line; the second one local configuration changes ("cuts and ties") in the 69 kV subsystem; the third one operational manipulation; and the fourth one curtailable industrial load management. The third and the fourth alternatives can be considered as noninvestment reinforcements. The results indicate that the cut-and-tie alternative in the 69 kV subsystem can provide the same reliability level as the 230 kV line addition but with much lower investment and therefore the initial 230 kV line addition could be deferred by 10 years. This deferral allows a major capital expenditure of 26.4 million (1997) to be avoided. The studies show that the application of quantitative transmission reliability assessment in power system planning can provide utilities with significant economic benefits.< >
ISSN:0885-8950
1558-0679