Preparations for pulse operation tests of the ITER CS model coil using the JT-60 power supply
Some preparations for pulse operation tests of the ITER CS model coil in the JT-60 power supply system have been performed. Since the ITER CS model coil takes a longer current ramp-up time, the pulse duration is extended up to 70 s from 15 s by decreasing the output voltage of the motor-generator. I...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on applied superconductivity 2000-03, Vol.10 (1), p.1410-1413 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Some preparations for pulse operation tests of the ITER CS model coil in the JT-60 power supply system have been performed. Since the ITER CS model coil takes a longer current ramp-up time, the pulse duration is extended up to 70 s from 15 s by decreasing the output voltage of the motor-generator. In the protection system a new grounding resistor with higher resistance has been installed and a new protection make-switch has also been developed. An analysis for the local resonances in the coil has been performed, and measurements of the coil impedance is planned to confirm the validity of the analysis results. |
---|---|