A Multistage Compressor Test Facility: Uncertainty Analysis and Preliminary Test Results
A multistage compressor test facility, fully instrumented with a dedicated data acquisition and processing system, has been developed to conduct experimental research work at the University of Ferrara. This paper provides a systematic description of the uncertainty analysis procedures required for c...
Gespeichert in:
Veröffentlicht in: | Journal of engineering for gas turbines and power 2005-01, Vol.127 (1), p.170-177, Article 170 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A multistage compressor test facility, fully instrumented with a dedicated data acquisition and processing system, has been developed to conduct experimental research work at the University of Ferrara. This paper provides a systematic description of the uncertainty analysis procedures required for compressor testing, including preliminary performance test results, in addition to a brief description of the test facility and its capabilities. |
---|---|
ISSN: | 0742-4795 1528-8919 |
DOI: | 10.1115/1.1787516 |