Maersk Oil & Gas extends drilling envelope
Mærsk drilled the horizontal reservoir section on a Halfdan well starting in May 2002 at 8,255 ft with a standard rotary steerable assembly. However, at 22,800 ft the company ceased drilling operation due to high surface torque readings (41-44,000 ft/ lbs) and a low rate of penetration (22 ft/hr). W...
Gespeichert in:
Veröffentlicht in: | Offshore (Conroe, Tex.) Tex.), 2006-02, Vol.66 (2), p.54 |
---|---|
Hauptverfasser: | , , , , , , |
Format: | Magazinearticle |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Mærsk drilled the horizontal reservoir section on a Halfdan well starting in May 2002 at 8,255 ft with a standard rotary steerable assembly. However, at 22,800 ft the company ceased drilling operation due to high surface torque readings (41-44,000 ft/ lbs) and a low rate of penetration (22 ft/hr). While drilling this section, attempts were made to reduce the high torque readings by adding up to 2% lubricant into the water based mud system. |
---|---|
ISSN: | 0030-0608 2688-3295 |