Significant Factors Causing Delay and Cost Overruns in Construction of Groundwater Projects in Ghana

In groundwater construction projects, many variables affect construction schedule and cost overruns. This paper aims to examine and evaluate the relative importance of the main factors that cause delay and cost overruns in groundwater construction projects. In order to identify these factors, a ques...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of construction research 2003-09, Vol.4 (2), p.175-187
Hauptverfasser: Frimpong, Yaw, Oluwoye, Jacob
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In groundwater construction projects, many variables affect construction schedule and cost overruns. This paper aims to examine and evaluate the relative importance of the main factors that cause delay and cost overruns in groundwater construction projects. In order to identify these factors, a questionnaire survey was conducted. Questionnaires were sent to professionals involved in groundwater construction projects in Ghana. The data was analyzed and ranked, based on the profession of the respondents and their roles in the industry (i.e. owners, contractors and consultants). The questionnaire survey consisted of 49 factors which were grouped into nine major categories, and the level of importance of the categories was measured and ranked by the relative importance weights. The percentage agreements in ranking among the three groups were measured. The results shows that: (1) the surveyed groups generally agreed that the project financing category is the main reason for groundwater construction delay and cost overruns, whereas the labor category is the least; (2) owners, consultants and contractors substantially agree on the ranking of the major categories of delay and cost overruns factors. The paper concludes that all the three groups felt that project financing, micro-economics, natural conditions and materials factor categories play a predominant role in causing delay and cost overruns to groundwater construction projects.
ISSN:1609-9451
1793-687X
DOI:10.1142/S1609945103000418