Project Delivery Systems and Project Change: Quantitative Analysis

Design/build has become one of the favored project delivery methods in the engineering construction industry. Numerous studies have advocated the use of design/build over the traditional design/bid/build delivery approach. A comprehensive analysis of 67 global projects from the Construction Industry...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of construction engineering and management 2003-07, Vol.129 (4), p.382-387
Hauptverfasser: Ibbs, C. William, Kwak, Young Hoon, Ng, Tzeyu, Odabasi, A. Murat
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Design/build has become one of the favored project delivery methods in the engineering construction industry. Numerous studies have advocated the use of design/build over the traditional design/bid/build delivery approach. A comprehensive analysis of 67 global projects from the Construction Industry Institute's database shows that design/build projects may not provide all the benefits to project performance. The study found timesaving was a definitive advantage of design/build project delivery, but, the positive effects of cost and productivity changes were not convincing. Based on the results of the study, the project management expertise and experience of the contractor may have a greater impact on project performance outcomes than focusing on project delivery strategy only.
ISSN:0733-9364
1943-7862
DOI:10.1061/(ASCE)0733-9364(2003)129:4(382)