An analysis of electricity end-use in air-conditioned office buildings in Hong Kong

There has been a growing interest in the electrical end-use patterns in air-conditioned commercial buildings in Hong Kong. A total of four high-rise fully air-conditioned office buildings were selected as case studies. The total building electrical load was broken down into four major electricity en...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Building and environment 2003-03, Vol.38 (3), p.493-498
Hauptverfasser: Lam, Joseph C, Li, Danny H.W, Cheung, S.O
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:There has been a growing interest in the electrical end-use patterns in air-conditioned commercial buildings in Hong Kong. A total of four high-rise fully air-conditioned office buildings were selected as case studies. The total building electrical load was broken down into four major electricity end-users, namely heating, ventilation and air-conditioning (HVAC), lighting, small power and lift/escalator. The hourly load profiles of these electricity end-users were monitored during the hot summer months of July and August. It was found that HVAC was the single largest electricity end-user, accounting for 30–60% of the total building electrical demand during office hours. Electric lighting was second with 20–35% and small power third with 15–25%. Lift/escalator accounted for a few percentage of the total building load. An analysis of the peak load revealed that chiller load was a major component. It was found that chiller load shifting using thermal chilled store could reduce the peak building load by about 20%.
ISSN:0360-1323
1873-684X
DOI:10.1016/S0360-1323(02)00132-4