Towards risk-based flood hazard management in the UK
Flood engineering in Britain is evolving from traditional approaches based on design standards to the development of risk-based decision-making, which involves taking account of a range of loads, defence system responses and impacts of flooding. Adopting such a ‘whole systems’ approach enables combi...
Gespeichert in:
Veröffentlicht in: | Proceedings of the Institution of Civil Engineers. Civil engineering 2002-05, Vol.150 (5), p.36-42 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Flood engineering in Britain is evolving from traditional approaches based on design standards to the development of risk-based decision-making, which involves taking account of a range of loads, defence system responses and impacts of flooding. Adopting such a ‘whole systems’ approach enables combinations of structural and non-structural approaches to be assessed and compared so resources can be targeted to best effect. Building on methods and know-how already in widespread use in river and coastal engineering, risk-analysis techniques are now being adopted in all areas—from high-level planning based on outline analysis to detailed designs using high-resolution simulation models. This paper explores some of the new techniques of this emerging approach to flood risk management. |
---|---|
ISSN: | 0965-089X 1751-7672 |
DOI: | 10.1680/cien.2002.150.5.36 |