Generation maintenance scheduling considering transmission constraints
This paper describes a new approach for establishing power systems scheduled generators outages for maintenance purposes. The time frame considered refers to power systems short-term operations planning horizon (i.e. one month ahead). The paper's main contribution is focused on modeling grid op...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on power systems 2000-05, Vol.15 (2), p.838-843 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper describes a new approach for establishing power systems scheduled generators outages for maintenance purposes. The time frame considered refers to power systems short-term operations planning horizon (i.e. one month ahead). The paper's main contribution is focused on modeling grid operational constraints, which are dealt with by a DC optimal power flow. The resulting large-scale optimization problem is solved by mixed-integer programming techniques aided by Benders decomposition strategy. The obtained results clearly show that representing transmission influence is essential for the establishment of a sound set of scheduled outages for the system's generators, especially in the case of hydrothermal systems. |
---|---|
ISSN: | 0885-8950 1558-0679 |
DOI: | 10.1109/59.867182 |