Fabrication of mock-up with Be armour tiles diffusion bonded to the CuCrZr heat sink
The aim of this work is the manufacture of high heat flux mock-ups with Be armour tiles on a CuCrZr heat sink for fabricating the beryllium section of the divertor vertical target (DVT) in the ITER reactor. Diffusion bonding between the CuCrZr bar and the beryllium tiles was obtained by inserting an...
Gespeichert in:
Veröffentlicht in: | Fusion engineering and design 2000-09, Vol.56-57, p.321-324 |
---|---|
Hauptverfasser: | , , , , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The aim of this work is the manufacture of high heat flux mock-ups with Be armour tiles on a CuCrZr heat sink for fabricating the beryllium section of the divertor vertical target (DVT) in the ITER reactor. Diffusion bonding between the CuCrZr bar and the beryllium tiles was obtained by inserting an aluminium interlayer to accommodate surface irregularities as well as to provide a compliant layer for accommodating thermal mismatches during both manufacturing and operation and cycles. |
---|---|
ISSN: | 0920-3796 |