Construction Labor Productivity Modeling with Neural Networks

Construction labor productivity is affected by several factors. Modeling of construction labor productivity could be challenging when effects of multiple factors are considered simultaneously. In this paper a methodology based on the regression and neural network modeling techniques is presented for...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of construction engineering and management 1998-12, Vol.124 (6), p.498-504
Hauptverfasser: Sonmez, Rifat, Rowings, James E
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Construction labor productivity is affected by several factors. Modeling of construction labor productivity could be challenging when effects of multiple factors are considered simultaneously. In this paper a methodology based on the regression and neural network modeling techniques is presented for quantitative evaluation of the impact of multiple factors on productivity. The methodology is applied to develop productivity models for concrete pouring, formwork, and concrete finishing tasks, using data compiled from eight building projects. The predictive behaviors of the models are compared with the previous productivity studies. Model results, advantages of the methodology, and study limitations are discussed.
ISSN:0733-9364
1943-7862
DOI:10.1061/(ASCE)0733-9364(1998)124:6(498)