The Mersey Estuary pollution alleviation scheme : Liverpool interceptor sewers

This paper describes the planning, design and construction of the principal Liverpool elements of the Mersey Estuary Pollution Alleviation Scheme. It excludes the primary wastewater treatment works at Sandon Dock which were separately designed and managed by North West Water (NWW). The planning of t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Proceedings of the Institution of Civil Engineers. Water, maritime and energy maritime and energy, 1999-12, Vol.136 (4), p.171-183
Hauptverfasser: OLSEN, G. N, DANBURY, M. F, LEATHERBARROW, B
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper describes the planning, design and construction of the principal Liverpool elements of the Mersey Estuary Pollution Alleviation Scheme. It excludes the primary wastewater treatment works at Sandon Dock which were separately designed and managed by North West Water (NWW). The planning of the project was originally undertaken by Liverpool City Engineer as agent for NWW, and includes major tunnels, combined sewer overflows/storm storage chambers, outfall penstock chambers, and a reactive real time control system. The design and construction covers a period of major management and technological change within the water industry.
ISSN:0965-0946
1753-7819
DOI:10.1680/iwtme.1999.31980