Resource Scheduling Using Neural Dynamics Model of Adeli and Park
This paper presents a mathematical model for resource scheduling considering project scheduling characteristics generally ignored in prior research, including precedence relationships, multiple crew-strategies, and time cost trade-off. Previous resource scheduling formulations have traditionally foc...
Gespeichert in:
Veröffentlicht in: | Journal of construction engineering and management 2001-02, Vol.127 (1), p.28-34 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper presents a mathematical model for resource scheduling considering project scheduling characteristics generally ignored in prior research, including precedence relationships, multiple crew-strategies, and time cost trade-off. Previous resource scheduling formulations have traditionally focused on project duration minimization. The proposed model considers the total project cost minimization. Furthermore, resource leveling and resource-constrained scheduling have traditionally been solved independently. In the new formulation, resource leveling and resource-constrained scheduling are performed simultaneously. The proposed model is solved using the patented neural dynamics model of Adeli and Park. A case study is presented to demonstrate the performance of the method under various resource availability profiles. |
---|---|
ISSN: | 0733-9364 1943-7862 |
DOI: | 10.1061/(ASCE)0733-9364(2001)127:1(28) |