Resource Scheduling Using Neural Dynamics Model of Adeli and Park

This paper presents a mathematical model for resource scheduling considering project scheduling characteristics generally ignored in prior research, including precedence relationships, multiple crew-strategies, and time cost trade-off. Previous resource scheduling formulations have traditionally foc...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of construction engineering and management 2001-02, Vol.127 (1), p.28-34
Hauptverfasser: Senouci, Ahmed B, Adeli, Hojjat
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper presents a mathematical model for resource scheduling considering project scheduling characteristics generally ignored in prior research, including precedence relationships, multiple crew-strategies, and time cost trade-off. Previous resource scheduling formulations have traditionally focused on project duration minimization. The proposed model considers the total project cost minimization. Furthermore, resource leveling and resource-constrained scheduling have traditionally been solved independently. In the new formulation, resource leveling and resource-constrained scheduling are performed simultaneously. The proposed model is solved using the patented neural dynamics model of Adeli and Park. A case study is presented to demonstrate the performance of the method under various resource availability profiles.
ISSN:0733-9364
1943-7862
DOI:10.1061/(ASCE)0733-9364(2001)127:1(28)