Personal Experiences Of Cost Control On the China Merchants Plaza Project
An engineer and project manager on a major construction project in Shanghai, China, recounts his experiences. The efficacy of competitive bidding and of a system of incentives is discussed. The problems averted-and the savings realized-by having the owner involved in the design from the start are em...
Gespeichert in:
Veröffentlicht in: | Leadership and management in engineering 2001-07, Vol.1 (3), p.36-38 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | An engineer and project manager on a major construction project in Shanghai, China, recounts his experiences. The efficacy of competitive bidding and of a system of incentives is discussed. The problems averted-and the savings realized-by having the owner involved in the design from the start are emphasized. Savings also came from questioning a traditional reliance on imported finishing materials. |
---|---|
ISSN: | 1532-6748 1943-5630 |
DOI: | 10.1061/(ASCE)1532-6748(2001)1:3(36) |