The effect of MARIKERJA, a fatigue management programme, on the management of fatigue among manufacturing shift workers in Indonesia

Objectives To evaluate the effects of a workplace fatigue management programme called MARIKERJA on reducing fatigue among manufacturing shift workers in Indonesia. Methods A quasi-experimental pre- and post-test study was conducted among 116 shift workers (58 in the intervention group and 58 in the...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International archives of occupational and environmental health 2022-12, Vol.95 (10), p.2017-2024
Hauptverfasser: Permatasari, Henny, Sahar, Junaiti, Mansyur, Muchtaruddin, Hardjono, Astrid Widayati
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Objectives To evaluate the effects of a workplace fatigue management programme called MARIKERJA on reducing fatigue among manufacturing shift workers in Indonesia. Methods A quasi-experimental pre- and post-test study was conducted among 116 shift workers (58 in the intervention group and 58 in the control group). The MARIKERJA programme was delivered to the intervention group for 12 weeks. Meanwhile, the control groups received the MARIKERJA intervention only at the end of the study period. Fatigue levels were measured using the Fatigue Severity Scale (FSS) in weeks 6 and 12 of the intervention. Data were analysed using a t test and a general linear model repeated measures procedure. Results There were significant differences in fatigue scores between the control and intervention groups after the MARIKERJA intervention in week 6 (40.07 ± 8.89 vs. 27.12 ± 11.67; p  
ISSN:0340-0131
1432-1246
DOI:10.1007/s00420-022-01904-1