Reactive scheduling approach for multipurpose chemical batch plants

In this paper a reactive scheduling technique for multipurpose plants is presented. A Mixed Integer Linear Problem (MILP) formulation is used based on the State Task Network (STN) representation of Kondili et. al. (1993). In order to obtain short response times a rolling horizon is utilized, which i...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Computers & chemical engineering 1996, Vol.20, p.S1215-S1220
Hauptverfasser: Rodrigues, M.T.M., Gimeno, L., Passos, C.A.S., Campos, M.D.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this paper a reactive scheduling technique for multipurpose plants is presented. A Mixed Integer Linear Problem (MILP) formulation is used based on the State Task Network (STN) representation of Kondili et. al. (1993). In order to obtain short response times a rolling horizon is utilized, which is reasonable as far as it is considered a reactive context where perturbations in the future are expected. To bring into consideration time constraints outside the rolling horizon a lookahead characteristic is introduced.
ISSN:0098-1354
1873-4375
DOI:10.1016/0098-1354(96)00210-4