A pilot system integrating a settling technique and a horizontal subsurface flow constructed wetland for the treatment of polluted lake water

An integrated system was tested at pilot-scale for treating polluted water from the Marriot Lake in Egypt, comprising a settling technique followed by three parallel horizontal subsurface flow constructed wetland (HFCWs) units operating under a continuous flow mode; one HFCW unit was planted with Ty...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Chemosphere (Oxford) 2022-05, Vol.295, p.133844-133844, Article 133844
Hauptverfasser: Gaballah, Mohamed S., Abdelwahab, Ola, Barakat, Khouloud M., Stefanakis, Alexandros I.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:An integrated system was tested at pilot-scale for treating polluted water from the Marriot Lake in Egypt, comprising a settling technique followed by three parallel horizontal subsurface flow constructed wetland (HFCWs) units operating under a continuous flow mode; one HFCW unit was planted with Typha angustifolia and contained a perforated pipes network for enhanced passive aeration (CWA), one unit was planted without the perforated pipe network (CWR) and one served as a Control unit (unplanted and without perforated pipes). Changes in physicochemical parameters, BOD5, nutrients (nitrogen, phosphorus), microbial community, and trace metals at different hydraulic retention times (HRT; 0.5–6 h) and hydraulic loading rates (HLR; 750, 1000, 1250, and 2000 L/m2/d) were monitored. The CWA unit had an overall better performance than the CWR unit, while both planted units outperformed the Control unit. CWA showed the highest performance at HLR of 1000 L/m2/d and 4-6 h-HRT with 95.3% removal for turbidity, 83% for BOD5, 99.3% for ammonia nitrogen (NH4–N), 70.8% for Total Nitrogen (TN), and 66.7% for Total Phosphorus (TP), while higher NO3–N and NO2–N effluent concentrations were observed. Trace metals levels were significantly reduced and accumulated in plant tissues. Microbial communities’ densities fluctuated in the CWA unit. The integrated system with the settling stage and the planted CWA unit was proved to achieve a high removal efficiency and reached the national discharge limits, thus representing a novel nature-based solution for the sustainable remediation of polluted lake water. [Display omitted] •An integrated system was tested at pilot-scale under a continuous mode of flow treating Lake Water.•Two days retention in the settling system were able to provide a considerable removal of the pollutants.•CWA unit showed an overall better performance than the CWR unit, while both planted units outperformed the Control unit.•The optimum performance was found at an HLR of 1000 L/m2/day and 4-6 hr-HRT.•The integrated system provides an effluent quality complying with the legal standard for environmental discharge.
ISSN:0045-6535
1879-1298
DOI:10.1016/j.chemosphere.2022.133844