Measurement of Work Progress: Quantitative Technique

In this paper a procedure is presented which provides a method to quantify work progress on construction projects. The procedure employs two management concepts, the work breakdown structure and the earned value. Although the theoretical basis for the proposed procedure is not new to the industry, i...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of construction engineering and management 1989-09, Vol.115 (3), p.462-474
1. Verfasser: Eldin, Neil N
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this paper a procedure is presented which provides a method to quantify work progress on construction projects. The procedure employs two management concepts, the work breakdown structure and the earned value. Although the theoretical basis for the proposed procedure is not new to the industry, it provides professional construction managers and project managers with a practical implementation of these concepts. The procedure is also an excellent computer application in construction management that requires only minimum programming skills. Examples of the input data file and output reports from an actual project are provided for numerical illustration.
ISSN:0733-9364
1943-7862
DOI:10.1061/(ASCE)0733-9364(1989)115:3(462)