Multicriteria scheduling of a railway renewal program
Quite often nowadays, Project Scheduling has to be studied as a multicriteria decision problem, whereas previously more traditional techniques, developed to minimize project duration, had been used. In this paper, the scheduling of projects within a large railway renewal program in northern Portugal...
Gespeichert in:
Veröffentlicht in: | European journal of operational research 1986, Vol.25 (3), p.395-405 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Quite often nowadays, Project Scheduling has to be studied as a multicriteria decision problem, whereas previously more traditional techniques, developed to minimize project duration, had been used. In this paper, the scheduling of projects within a large railway renewal program in northern Portugal is studied adopting a formulation based on three major criteria. This model (Trident), described and used here, has been developed by the author to aid in three-dimensional decision problems. |
---|---|
ISSN: | 0377-2217 1872-6860 |
DOI: | 10.1016/0377-2217(86)92000-X |