First results from the XMCD facility at the Energy‐Dispersive EXAFS beamline of the Indus‐2 synchrotron source

Setting up of the X‐ray Magnetic Circular Dichroism (XMCD) measurement facility with hard X‐rays at the Energy‐Dispersive EXAFS beamline (BL‐08) at the Indus‐2 synchrotron source is reported. This includes the design and development of a water‐cooled electromagnet having a highest magnetic field of...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of synchrotron radiation 2019-03, Vol.26 (2), p.445-449
Hauptverfasser: Patra, N., Sachan, U. G. P. S., SundarRajan, S., Malhotra, Sanjay, Harad, Vijay, Agarwal, Ankur, Divedi, Ashutosh, Jha, S. N., Bhattacharyya, D.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Setting up of the X‐ray Magnetic Circular Dichroism (XMCD) measurement facility with hard X‐rays at the Energy‐Dispersive EXAFS beamline (BL‐08) at the Indus‐2 synchrotron source is reported. This includes the design and development of a water‐cooled electromagnet having a highest magnetic field of 2 T in a good field volume of 125 mm3 and having a 10 mm hole throughout for passage of the synchrotron beam. This also includes the development of an (X–Z–gθ) motion stage for the heavy electromagnet for aligning its axis and the beam hole along the synchrotron beam direction. Along with the above developments, also reported is the first XMCD signal measured on a thick Gd film in the above set‐up which shows good agreement with the reported results. This is the first facility to carry out XMCD measurement with hard X‐rays in India. Setting up of the X‐ray Magnetic Circular Dichroism measurement facility with hard X‐rays at the Energy‐Dispersive EXAFS beamline (BL‐08) at the Indus‐2 synchrotron source is reported.
ISSN:1600-5775
0909-0495
1600-5775
DOI:10.1107/S1600577519000602