Cost-Time-Risk Diagram: Project Planning and Management
This article presents the integration of cost and time performance measurement with project risk analysis into one diagram, called the Cost-Time-Risk diagram (CTR). The author believes the presented CTR diagram is a revolution in earned value analysis. It plots the total brainstorming of project cos...
Gespeichert in:
Veröffentlicht in: | Cost engineering (Morgantown, W. Va.) W. Va.), 2006-11, Vol.48 (11), p.12-18 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This article presents the integration of cost and time performance measurement with project risk analysis into one diagram, called the Cost-Time-Risk diagram (CTR). The author believes the presented CTR diagram is a revolution in earned value analysis. It plots the total brainstorming of project cost-time planning versus actual production. It also integrates evaluation of internal risks, external risks, and project specific risks. The steps to prepare and to operate the CTR diagram are explained. The article also illustrates, with graphical movement, decision-making information that many project managers struggle in developing. [PUBLICATION ABSTRACT] |
---|---|
ISSN: | 0274-9696 |