MEASUREMENTS OF THREE-DIMENSIONAL DISPLACEMENTS OF SLOPE GENERATED DURING LARGE ROCK MASS EXCAVATION
Three-dimensional displacements during large rock mass excavation were measured using a three-components underground inclinometer. From these, a vertical deformation (rebound), a horizontal deformation, a convergence time and a trend of non-linear increase of vertical strain by a removed load were c...
Gespeichert in:
Veröffentlicht in: | Doboku Gakkai Ronbunshuu C 2008, Vol.64(4), pp.718-731 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Three-dimensional displacements during large rock mass excavation were measured using a three-components underground inclinometer. From these, a vertical deformation (rebound), a horizontal deformation, a convergence time and a trend of non-linear increase of vertical strain by a removed load were clarified. And a practical elasticity coefficient was estimated by a removed load of excavation and a vertical deformation. Furthermore, the relation between a removed load process of a borehole lateral load test carried out before excavation and an elasticity coefficient was investigated. Based on these studies, the method of developing analytical model using a data of borehole lateral load test carried out before excavation and the risk control criteria during excavation were proposed. |
---|---|