M-PERT: Manual Project-Duration Estimation Technique for Teaching Scheduling Basics

AbstractThe program evaluation and review technique (PERT) has become a classic project management tool for estimating project duration when the activities have uncertain durations. However, despite its simplicity and widespread adoption, the original PERT, in neglecting the merge event bias, signif...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of construction engineering and management 2017-09, Vol.143 (9)
1. Verfasser: Ballesteros-Pérez, Pablo
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:AbstractThe program evaluation and review technique (PERT) has become a classic project management tool for estimating project duration when the activities have uncertain durations. However, despite its simplicity and widespread adoption, the original PERT, in neglecting the merge event bias, significantly underestimated the duration average and overestimated the duration variance of real-life projects. To avoid these and other shortcomings, many authors have worked over the last 60 years at producing interesting alternative PERT extensions. This paper proposes joining the most relevant of those to create a new reformulated PERT, named M-PERT. This reformulation is quite accurate when estimating real project duration, but allows for a number of interesting network modeling features that the original PERT lacked: probabilistic alternative paths, activity self-loops, minima of activity sets, and correlation between activities. However, unlike similar scheduling methods, M-PERT allows manual calculation through a recursive merging procedure that downsizes the network until the last standing activity represents the whole (or remaining) project duration. Hence, M-PERT constitutes an attractive tool for teaching scheduling basics to engineering students in a more intuitive way, with or without the assistance of computer-based simulations or software. One full case study is described and future research paths are suggested.
ISSN:0733-9364
1943-7862
DOI:10.1061/(ASCE)CO.1943-7862.0001358