Research on Transfer and Replacement Mechanism Design of Inter-Provincial Electricity Treatment in South China Electricity Market

In the context of south china electricity market, the concept of contract transfer and replacement deal is set forth in advance which is specialized in electricity treatment. Then, the feasibility of conducting an inter-provincial contract transfer and replacement is analyzed according to the aspect...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Applied Mechanics and Materials 2014-02, Vol.494-495 (Current Development of Mechanical Engineering and Energy), p.1695-1701
Hauptverfasser: Jing, Zhao Xia, He, Zheng Xin, Sun, Yan Ming, Zhang, Sen Lin
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In the context of south china electricity market, the concept of contract transfer and replacement deal is set forth in advance which is specialized in electricity treatment. Then, the feasibility of conducting an inter-provincial contract transfer and replacement is analyzed according to the aspects of physical characteristics, economics and policies within the china southern power grid. In addition, the advantage and disadvantage are also presented in terms of bilateral negotiation and centralized biding transaction modes. After that, the pricing mechanism and transaction mode are deliberately designed pertaining to three different situations including a party power shortage and a party "abandon water", a party power supply shortage and a party power surplus and a party power surplus and a party "abandon water". Finally, the realistic feasibility of the proposed schemes is verified through an employed numerical example.
ISSN:1660-9336
1662-7482
1662-7482
DOI:10.4028/www.scientific.net/AMM.494-495.1695