Controlled Permeation Grouting Method for Mitigation of Liquefaction

AbstractThe application of silica stabilizers to a liquefiable ground covered by existing structures is a challenge to engineers. This paper provides details of ground improvement under the runway and around the common ducts of Fukuoka International Airport. The ground was improved via a newly devel...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of geotechnical and geoenvironmental engineering 2016-11, Vol.142 (11)
Hauptverfasser: Rasouli, Rouzbeh, Hayashi, Kentaro, Zen, Kouki
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:AbstractThe application of silica stabilizers to a liquefiable ground covered by existing structures is a challenge to engineers. This paper provides details of ground improvement under the runway and around the common ducts of Fukuoka International Airport. The ground was improved via a newly developed controlled curved drilling machine to enable controlled permeation grouting under the runway without any disturbance to its operation. At this stage approximately 100 m of the runway has been improved. Experiments on the gel time and the form of chemical diffusion at different injection times secured the improvement of ground in the desired zone, and a posttreatment investigation confirmed this improvement.
ISSN:1090-0241
1943-5606
DOI:10.1061/(ASCE)GT.1943-5606.0001532