Control of a two wired hammerhead tower crane
A new configuration of a hammerhead crane is proposed. Instead of a single cable, it is introduced a second hoisting cable. It is shown a mathematical model that relates both hoisting cables and is set the corresponding linear feedback control law that coordinate both cables. We found that the new c...
Gespeichert in:
Veröffentlicht in: | Nonlinear dynamics 2016-06, Vol.84 (4), p.2137-2148 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A new configuration of a hammerhead crane is proposed. Instead of a single cable, it is introduced a second hoisting cable. It is shown a mathematical model that relates both hoisting cables and is set the corresponding linear feedback control law that coordinate both cables. We found that the new configuration outperforms the old one (with single cable) with respect to oscillations. |
---|---|
ISSN: | 0924-090X 1573-269X |
DOI: | 10.1007/s11071-016-2634-3 |