Effective transmission constrained economic dispatch for production costing

Summary In this paper, an effective Schur complement method is presented to solve transmission‐constrained dispatch (TCD) for Monte Carlo production costing. Several techniques for improving TCD performance are also proposed by taking the advantages of TCD special problem structures. Numerical testi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of numerical modelling 2016-07, Vol.29 (4), p.623-636
Hauptverfasser: Wu, Yu-Chi, Huang, Wen-Liang, Wang, Sheng-Ching, Lin, Jin-Yuan, Chang, Wei-Fu
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Summary In this paper, an effective Schur complement method is presented to solve transmission‐constrained dispatch (TCD) for Monte Carlo production costing. Several techniques for improving TCD performance are also proposed by taking the advantages of TCD special problem structures. Numerical testing on a real‐life large‐scale power system is presented to illustrate the performance of these proposed methodologies. Copyright © 2015 John Wiley & Sons, Ltd.
ISSN:0894-3370
1099-1204
DOI:10.1002/jnm.2116