Estimation of overall equipment effectiveness using simulation programme

A queuing system of the M M 1 N type with cyclic failure-free and repair times and cyclic defective production is used as a model of a single machine production system. Production tasks arrive according to an exponential process and are served with normally disturbed processing time. Successive work...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IOP conference series. Materials Science and Engineering 2015-11, Vol.95 (1), p.12155
Hauptverfasser: Paprocka, I, Kempa, W, Kalinowski, K, Grabowik, C
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A queuing system of the M M 1 N type with cyclic failure-free and repair times and cyclic defective production is used as a model of a single machine production system. Production tasks arrive according to an exponential process and are served with normally disturbed processing time. Successive working (failure-free) times, repair times and defect-free production have exponential distributions. Defective products can be recirculated and back to the production line according to a Bernoulli distributions. The objective is to evaluate effectiveness of the production system using Overall Equipment Effectiveness before and after introducing improvement initiatives.
ISSN:1757-8981
1757-899X
DOI:10.1088/1757-899X/95/1/012155