Burden Distribution Calculation of Bell-Less Top of Blast Furnace Based on Multi-Radar Data

The burden distribution real-time estimation problem of multi-loop charging based on the real multi-radar data is resolved.Firstly , an iterative algorithm is introduced to calculate the radial coordinate of the pile-top.Then , based on the multi-radar data , the burden profile is estimated by a cub...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of iron and steel research, international international, 2013-06, Vol.20 (6), p.33-37
Hauptverfasser: Zhu, Qiao, Lü, Cheng-long, Yin, Yi-xin, Chen, Xian-zhong
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The burden distribution real-time estimation problem of multi-loop charging based on the real multi-radar data is resolved.Firstly , an iterative algorithm is introduced to calculate the radial coordinate of the pile-top.Then , based on the multi-radar data , the burden profile is estimated by a cubic-curve equation at the end of the multi-loop charging.Furthermore , the burden profile before the next multi-loop charging is calculated based on multi-radar data by considering the impact of burden descent.On the basis of these burden profiles , a more accurate thickness ratio of ore to coke ( RO/C ) at the radial direction of blast furnace can be obtained.Finally , an example is given to calculate the burden profiles and RO/C by using the real multi-radar data sampled from Baosteel , which shows the effectiveness of the method introduced.
ISSN:1006-706X
2210-3988
DOI:10.1016/s1006-706x(13)60108-9