Burden Distribution Calculation of Bell-Less Top of Blast Furnace Based on Multi-Radar Data
The burden distribution real-time estimation problem of multi-loop charging based on the real multi-radar data is resolved.Firstly , an iterative algorithm is introduced to calculate the radial coordinate of the pile-top.Then , based on the multi-radar data , the burden profile is estimated by a cub...
Gespeichert in:
Veröffentlicht in: | Journal of iron and steel research, international international, 2013-06, Vol.20 (6), p.33-37 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The burden distribution real-time estimation problem of multi-loop charging based on the real multi-radar data is resolved.Firstly , an iterative algorithm is introduced to calculate the radial coordinate of the pile-top.Then , based on the multi-radar data , the burden profile is estimated by a cubic-curve equation at the end of the multi-loop charging.Furthermore , the burden profile before the next multi-loop charging is calculated based on multi-radar data by considering the impact of burden descent.On the basis of these burden profiles , a more accurate thickness ratio of ore to coke ( RO/C ) at the radial direction of blast furnace can be obtained.Finally , an example is given to calculate the burden profiles and RO/C by using the real multi-radar data sampled from Baosteel , which shows the effectiveness of the method introduced. |
---|---|
ISSN: | 1006-706X 2210-3988 |
DOI: | 10.1016/s1006-706x(13)60108-9 |