A Real-Time Analysis and Feedback System for Quality Control of Dam Foundation Grouting Engineering

Real-time analysis and feedback systems play a vital role in obtaining good results from grouting processes. However, when there are intense construction schedules and complex geological structures, it is difficult for existing systems to provide to site engineers, prior to the borehole construction...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Rock mechanics and rock engineering 2015-09, Vol.48 (5), p.1947-1968
Hauptverfasser: Zhong, D. H., Yan, F. G., Li, M. C., Huang, C. X., Fan, K., Tang, J. F.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Real-time analysis and feedback systems play a vital role in obtaining good results from grouting processes. However, when there are intense construction schedules and complex geological structures, it is difficult for existing systems to provide to site engineers, prior to the borehole construction, prompt and accurate feedback, such as detailed geological information about grouting boreholes, which limits the use of such systems in practical applications. This paper proposes combining a three-dimensional (3D) geological model with real-time data collection technology in a system for both monitoring grouting, and providing analysis and feedback. This integrated grouting model, which comprises the geological model, the grouting borehole model and the grouting parameter database set, can be coupled and associated dynamically with grouting data. Additionally, the following methods are applied in this system: real-time grouting data processing and a monitoring alarm, prediction and visualization of geological conditions, forecasting of rock uplift, and visualization analysis of grouting parameters. The application of this system in Hydropower Project A, China is used as a case study. The predictions of geological conditions are closely matched with the actual situation, and this system can be used to monitor construction processes remotely and to help site engineers to design reasonable construction plans, optimize layouts for grouting boreholes and adjust construction measures.
ISSN:0723-2632
1434-453X
DOI:10.1007/s00603-014-0686-6