Risk analysis of geothermal power plants using Failure Modes and Effects Analysis (FMEA) technique

•Using Failure Modes and Effects Analysis (FMEA) to find potential failures in geothermal power plants.•We considered 5 major parts of geothermal power plants for risk analysis.•Risk Priority Number (RPN) is calculated for all failure modes.•Corrective actions are recommended to eliminate or decreas...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Energy conversion and management 2013-08, Vol.72, p.69-76
Hauptverfasser: Feili, Hamid Reza, Akar, Navid, Lotfizadeh, Hossein, Bairampour, Mohammad, Nasiri, Sina
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:•Using Failure Modes and Effects Analysis (FMEA) to find potential failures in geothermal power plants.•We considered 5 major parts of geothermal power plants for risk analysis.•Risk Priority Number (RPN) is calculated for all failure modes.•Corrective actions are recommended to eliminate or decrease the risk of failure modes. Renewable energy plays a key role in the transition toward a low carbon economy and the provision of a secure supply of energy. Geothermal energy is a versatile source as a form of renewable energy that meets popular demand. Since some Geothermal Power Plants (GPPs) face various failures, the requirement of a technique for team engineering to eliminate or decrease potential failures is considerable. Because no specific published record of considering an FMEA applied to GPPs with common failure modes have been found already, in this paper, the utilization of Failure Modes and Effects Analysis (FMEA) as a convenient technique for determining, classifying and analyzing common failures in typical GPPs is considered. As a result, an appropriate risk scoring of occurrence, detection and severity of failure modes and computing the Risk Priority Number (RPN) for detecting high potential failures is achieved. In order to expedite accuracy and ability to analyze the process, XFMEA software is utilized. Moreover, 5 major parts of a GPP is studied to propose a suitable approach for developing GPPs and increasing reliability by recommending corrective actions for each failure mode.
ISSN:0196-8904
1879-2227
DOI:10.1016/j.enconman.2012.10.027