Intelligent Autofeedback and Safety Early-Warning for Underground Cavern Engineering during Construction Based on BP Neural Network and FEM

The low efficiency of feedback analysis is one of the main shortcomings in the construction of underground cavern engineering. With this in mind, a method of intelligent autofeedback and safety early-warning for underground cavern is proposed based on BP neural network and FEM. The training sample p...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Mathematical problems in engineering 2015-01, Vol.2015 (2015), p.1-8
Hauptverfasser: Lei, Xu, Ren, Qingwen, Zhang, Taijun
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The low efficiency of feedback analysis is one of the main shortcomings in the construction of underground cavern engineering. With this in mind, a method of intelligent autofeedback and safety early-warning for underground cavern is proposed based on BP neural network and FEM. The training sample points are chosen by using uniform test design method, and the autogeneration of FEM calculation file for ABAQUS is realized by using the technique of file partition, information grouping, and orderly numbering. Then, intelligent autoinversion of mechanics parameters is realized, and the automatic connection of parameter inversion, subsequent prediction, and safety early-warning is achieved. The software of intelligent autofeedback and safety early-warning for underground cavern engineering during construction is developed. Finally, the applicability of the proposed method and the developed software is verified through an application example of underground cavern of a pumped-storage power station located in Southwest China.
ISSN:1024-123X
1563-5147
DOI:10.1155/2015/873823