A Plant-Wide Dynamic Model of a Continuous Pharmaceutical Process

The pharmaceutical industry has historically benefited from high profit margins for their products, and over the years limited efforts have been made to change the main manufacturing concept from batch into continuous. However, over the past decade, as a result of an increased demand for more effici...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Industrial & engineering chemistry research 2012-11, Vol.51 (47), p.15393-15412
Hauptverfasser: Benyahia, Brahim, Lakerveld, Richard, Barton, Paul I
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The pharmaceutical industry has historically benefited from high profit margins for their products, and over the years limited efforts have been made to change the main manufacturing concept from batch into continuous. However, over the past decade, as a result of an increased demand for more efficient and cost-effective processes, interest has grown in the application of continuous manufacturing to address economical and technical issues in the pharmaceutical field. This option is becoming more viable, particularly with the implementation of new process analytical technology (PAT). In this paper, we present a plant-wide mathematical model inspired by a recently developed continuous pharmaceutical pilot plant. This model is first used to simulate a base case that shows typical limitations in achieving simultaneously high productivity and quality. The main critical quality attribute considered is the purity of the final product. To alleviate the base case limitations and improve the pilot plant performance, the effects of several design parameters are investigated and the most critical are identified. In addition, alternative start-up scenarios are considered to improve the transient performance of the pilot plant, particularly time to steady state. The environmental footprint of the pilot plant is evaluated and shown to be low.
ISSN:0888-5885
1520-5045
DOI:10.1021/ie3006319