Regional Approach to Large Scale Wind Integration in South East Europe

The Southeast Europe Cooperation Initiative Transmission System Planning Project (SECI TSP) is a unique development assistance collaboration supported by the transmission system operators of Southeast Europe (SEE), the United States Agency for International Development (USAID) and the United States...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Energy & environment (Essex, England) England), 2015-01, Vol.26 (1-2), p.95-109
Hauptverfasser: Majstrović, Goran, Polen, William L.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 109
container_issue 1-2
container_start_page 95
container_title Energy & environment (Essex, England)
container_volume 26
creator Majstrović, Goran
Polen, William L.
description The Southeast Europe Cooperation Initiative Transmission System Planning Project (SECI TSP) is a unique development assistance collaboration supported by the transmission system operators of Southeast Europe (SEE), the United States Agency for International Development (USAID) and the United States Energy Association (USEA). Members of the SECI TSP include 10 transmission system operators from Albania, Bosnia-Herzegovina, Bulgaria, Croatia, Kosovo, Macedonia, Montenegro, Serbia, Romania and Turkey. Slovenia, Greece and Italy participate in the SECI TSP as observers. This paper provides a brief introduction to the SECI TSP and reviews results of a SECI TSP study of the capacity of the high voltage electricity transmission network in SEE to integrate wind power. The analysis results from wind power plant (WPP) data collected and verified by 12 TSOs (including Slovenia and Greece) through a series of detailed questionnaires (324 inputs collected) and intensive regional cooperation supported by USAID and USEA since 2000. Besides that, large set of input data on hourly WPP generation profiles for each SECI country for the 2020 planning horizon was employed from the Pan-European Market Database (87,600 output data). Historical data on WPP generation was used as a reference when such data was available, as well as the data available from the national wind integration studies. The study identifies limiting factors for large scale WPP integration in SEE, contains an analysis of expected WPP output variation, forecasts reserve capacities in the region, identifies network bottleneck resulting from large scale wind integration, and calculates the impact of WPP on regional network losses. The study results indicate that owing to the sub-regional characteristics of wind patterns, the countries of SEE could reduce by approximately 50% the amount of reserve capacity needed to balance intermittent wind production if such capacity is provided on a regional basis as opposed to the traditional country-by-country approach. This would open up more than 2,000 MW of capacity to be available to the regional electricity market as opposed to holding them in reserve on an individual, country-by country basis. Also, more than 30 regional network bottlenecks were identified as a result of large scale WPP integration through different load flow scenarios.
doi_str_mv 10.1260/0958-305X.26.1-2.95
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_1677984877</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sage_id>10.1260_0958-305X.26.1-2.95</sage_id><sourcerecordid>1677984877</sourcerecordid><originalsourceid>FETCH-LOGICAL-c356t-19c958e16af0cc2a8c218ceb8d4322b8cff9a7df4de0221e789cbe8b8c53e7c73</originalsourceid><addsrcrecordid>eNqNkD1PwzAURS0EEuXjF7B4ZEl5tpPYHquqhUqVkCgINst1XtJUaRzsZODfk6qIETG94Z17dXUIuWMwZTyHB9CZSgRkH1OeT1nCpzo7IxMOqUpSkHBOJr_EJbmKcQ_AQTM9IcsXrGrf2obOui5463a093RtQ4V042yD9L1uC7pqe6yC7UeU1i3d-KHf0YWNPV0MwXd4Qy5K20S8_bnX5G25eJ0_Jevnx9V8tk6cyPI-YdqNO5DltgTnuFWOM-Vwq4pUcL5Vriy1lUWZFgicM5RKuy2q8ZEJlE6Ka3J_6h23fg4Ye3Ooo8OmsS36IRqWS6lVquS_UCG0BkhHVJxQF3yMAUvThfpgw5dhYI6CzVGfOeozPDfMcKOzMQWnVLQVmr0fwqgx_hn5BqwifIY</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1673399004</pqid></control><display><type>article</type><title>Regional Approach to Large Scale Wind Integration in South East Europe</title><source>SAGE Complete A-Z List</source><source>Jstor Complete Legacy</source><creator>Majstrović, Goran ; Polen, William L.</creator><creatorcontrib>Majstrović, Goran ; Polen, William L.</creatorcontrib><description>The Southeast Europe Cooperation Initiative Transmission System Planning Project (SECI TSP) is a unique development assistance collaboration supported by the transmission system operators of Southeast Europe (SEE), the United States Agency for International Development (USAID) and the United States Energy Association (USEA). Members of the SECI TSP include 10 transmission system operators from Albania, Bosnia-Herzegovina, Bulgaria, Croatia, Kosovo, Macedonia, Montenegro, Serbia, Romania and Turkey. Slovenia, Greece and Italy participate in the SECI TSP as observers. This paper provides a brief introduction to the SECI TSP and reviews results of a SECI TSP study of the capacity of the high voltage electricity transmission network in SEE to integrate wind power. The analysis results from wind power plant (WPP) data collected and verified by 12 TSOs (including Slovenia and Greece) through a series of detailed questionnaires (324 inputs collected) and intensive regional cooperation supported by USAID and USEA since 2000. Besides that, large set of input data on hourly WPP generation profiles for each SECI country for the 2020 planning horizon was employed from the Pan-European Market Database (87,600 output data). Historical data on WPP generation was used as a reference when such data was available, as well as the data available from the national wind integration studies. The study identifies limiting factors for large scale WPP integration in SEE, contains an analysis of expected WPP output variation, forecasts reserve capacities in the region, identifies network bottleneck resulting from large scale wind integration, and calculates the impact of WPP on regional network losses. The study results indicate that owing to the sub-regional characteristics of wind patterns, the countries of SEE could reduce by approximately 50% the amount of reserve capacity needed to balance intermittent wind production if such capacity is provided on a regional basis as opposed to the traditional country-by-country approach. This would open up more than 2,000 MW of capacity to be available to the regional electricity market as opposed to holding them in reserve on an individual, country-by country basis. Also, more than 30 regional network bottlenecks were identified as a result of large scale WPP integration through different load flow scenarios.</description><identifier>ISSN: 0958-305X</identifier><identifier>EISSN: 2048-4070</identifier><identifier>DOI: 10.1260/0958-305X.26.1-2.95</identifier><language>eng</language><publisher>London, England: SAGE Publications</publisher><subject>Electricity ; Large scale integration ; Markets ; Networks ; Regional ; Reserve capacity ; Wind power ; Wind power generation</subject><ispartof>Energy &amp; environment (Essex, England), 2015-01, Vol.26 (1-2), p.95-109</ispartof><rights>2015 SAGE Publications</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c356t-19c958e16af0cc2a8c218ceb8d4322b8cff9a7df4de0221e789cbe8b8c53e7c73</citedby></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://journals.sagepub.com/doi/pdf/10.1260/0958-305X.26.1-2.95$$EPDF$$P50$$Gsage$$H</linktopdf><linktohtml>$$Uhttps://journals.sagepub.com/doi/10.1260/0958-305X.26.1-2.95$$EHTML$$P50$$Gsage$$H</linktohtml><link.rule.ids>314,776,780,21799,27903,27904,43600,43601</link.rule.ids></links><search><creatorcontrib>Majstrović, Goran</creatorcontrib><creatorcontrib>Polen, William L.</creatorcontrib><title>Regional Approach to Large Scale Wind Integration in South East Europe</title><title>Energy &amp; environment (Essex, England)</title><description>The Southeast Europe Cooperation Initiative Transmission System Planning Project (SECI TSP) is a unique development assistance collaboration supported by the transmission system operators of Southeast Europe (SEE), the United States Agency for International Development (USAID) and the United States Energy Association (USEA). Members of the SECI TSP include 10 transmission system operators from Albania, Bosnia-Herzegovina, Bulgaria, Croatia, Kosovo, Macedonia, Montenegro, Serbia, Romania and Turkey. Slovenia, Greece and Italy participate in the SECI TSP as observers. This paper provides a brief introduction to the SECI TSP and reviews results of a SECI TSP study of the capacity of the high voltage electricity transmission network in SEE to integrate wind power. The analysis results from wind power plant (WPP) data collected and verified by 12 TSOs (including Slovenia and Greece) through a series of detailed questionnaires (324 inputs collected) and intensive regional cooperation supported by USAID and USEA since 2000. Besides that, large set of input data on hourly WPP generation profiles for each SECI country for the 2020 planning horizon was employed from the Pan-European Market Database (87,600 output data). Historical data on WPP generation was used as a reference when such data was available, as well as the data available from the national wind integration studies. The study identifies limiting factors for large scale WPP integration in SEE, contains an analysis of expected WPP output variation, forecasts reserve capacities in the region, identifies network bottleneck resulting from large scale wind integration, and calculates the impact of WPP on regional network losses. The study results indicate that owing to the sub-regional characteristics of wind patterns, the countries of SEE could reduce by approximately 50% the amount of reserve capacity needed to balance intermittent wind production if such capacity is provided on a regional basis as opposed to the traditional country-by-country approach. This would open up more than 2,000 MW of capacity to be available to the regional electricity market as opposed to holding them in reserve on an individual, country-by country basis. Also, more than 30 regional network bottlenecks were identified as a result of large scale WPP integration through different load flow scenarios.</description><subject>Electricity</subject><subject>Large scale integration</subject><subject>Markets</subject><subject>Networks</subject><subject>Regional</subject><subject>Reserve capacity</subject><subject>Wind power</subject><subject>Wind power generation</subject><issn>0958-305X</issn><issn>2048-4070</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2015</creationdate><recordtype>article</recordtype><recordid>eNqNkD1PwzAURS0EEuXjF7B4ZEl5tpPYHquqhUqVkCgINst1XtJUaRzsZODfk6qIETG94Z17dXUIuWMwZTyHB9CZSgRkH1OeT1nCpzo7IxMOqUpSkHBOJr_EJbmKcQ_AQTM9IcsXrGrf2obOui5463a093RtQ4V042yD9L1uC7pqe6yC7UeU1i3d-KHf0YWNPV0MwXd4Qy5K20S8_bnX5G25eJ0_Jevnx9V8tk6cyPI-YdqNO5DltgTnuFWOM-Vwq4pUcL5Vriy1lUWZFgicM5RKuy2q8ZEJlE6Ka3J_6h23fg4Ye3Ooo8OmsS36IRqWS6lVquS_UCG0BkhHVJxQF3yMAUvThfpgw5dhYI6CzVGfOeozPDfMcKOzMQWnVLQVmr0fwqgx_hn5BqwifIY</recordid><startdate>201501</startdate><enddate>201501</enddate><creator>Majstrović, Goran</creator><creator>Polen, William L.</creator><general>SAGE Publications</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7ST</scope><scope>7TG</scope><scope>7U6</scope><scope>C1K</scope><scope>KL.</scope><scope>SOI</scope><scope>7SP</scope><scope>7SU</scope><scope>7TB</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope><scope>L7M</scope></search><sort><creationdate>201501</creationdate><title>Regional Approach to Large Scale Wind Integration in South East Europe</title><author>Majstrović, Goran ; Polen, William L.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c356t-19c958e16af0cc2a8c218ceb8d4322b8cff9a7df4de0221e789cbe8b8c53e7c73</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2015</creationdate><topic>Electricity</topic><topic>Large scale integration</topic><topic>Markets</topic><topic>Networks</topic><topic>Regional</topic><topic>Reserve capacity</topic><topic>Wind power</topic><topic>Wind power generation</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Majstrović, Goran</creatorcontrib><creatorcontrib>Polen, William L.</creatorcontrib><collection>CrossRef</collection><collection>Environment Abstracts</collection><collection>Meteorological &amp; Geoastrophysical Abstracts</collection><collection>Sustainability Science Abstracts</collection><collection>Environmental Sciences and Pollution Management</collection><collection>Meteorological &amp; Geoastrophysical Abstracts - Academic</collection><collection>Environment Abstracts</collection><collection>Electronics &amp; Communications Abstracts</collection><collection>Environmental Engineering Abstracts</collection><collection>Mechanical &amp; Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><collection>Advanced Technologies Database with Aerospace</collection><jtitle>Energy &amp; environment (Essex, England)</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Majstrović, Goran</au><au>Polen, William L.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Regional Approach to Large Scale Wind Integration in South East Europe</atitle><jtitle>Energy &amp; environment (Essex, England)</jtitle><date>2015-01</date><risdate>2015</risdate><volume>26</volume><issue>1-2</issue><spage>95</spage><epage>109</epage><pages>95-109</pages><issn>0958-305X</issn><eissn>2048-4070</eissn><abstract>The Southeast Europe Cooperation Initiative Transmission System Planning Project (SECI TSP) is a unique development assistance collaboration supported by the transmission system operators of Southeast Europe (SEE), the United States Agency for International Development (USAID) and the United States Energy Association (USEA). Members of the SECI TSP include 10 transmission system operators from Albania, Bosnia-Herzegovina, Bulgaria, Croatia, Kosovo, Macedonia, Montenegro, Serbia, Romania and Turkey. Slovenia, Greece and Italy participate in the SECI TSP as observers. This paper provides a brief introduction to the SECI TSP and reviews results of a SECI TSP study of the capacity of the high voltage electricity transmission network in SEE to integrate wind power. The analysis results from wind power plant (WPP) data collected and verified by 12 TSOs (including Slovenia and Greece) through a series of detailed questionnaires (324 inputs collected) and intensive regional cooperation supported by USAID and USEA since 2000. Besides that, large set of input data on hourly WPP generation profiles for each SECI country for the 2020 planning horizon was employed from the Pan-European Market Database (87,600 output data). Historical data on WPP generation was used as a reference when such data was available, as well as the data available from the national wind integration studies. The study identifies limiting factors for large scale WPP integration in SEE, contains an analysis of expected WPP output variation, forecasts reserve capacities in the region, identifies network bottleneck resulting from large scale wind integration, and calculates the impact of WPP on regional network losses. The study results indicate that owing to the sub-regional characteristics of wind patterns, the countries of SEE could reduce by approximately 50% the amount of reserve capacity needed to balance intermittent wind production if such capacity is provided on a regional basis as opposed to the traditional country-by-country approach. This would open up more than 2,000 MW of capacity to be available to the regional electricity market as opposed to holding them in reserve on an individual, country-by country basis. Also, more than 30 regional network bottlenecks were identified as a result of large scale WPP integration through different load flow scenarios.</abstract><cop>London, England</cop><pub>SAGE Publications</pub><doi>10.1260/0958-305X.26.1-2.95</doi><tpages>15</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0958-305X
ispartof Energy & environment (Essex, England), 2015-01, Vol.26 (1-2), p.95-109
issn 0958-305X
2048-4070
language eng
recordid cdi_proquest_miscellaneous_1677984877
source SAGE Complete A-Z List; Jstor Complete Legacy
subjects Electricity
Large scale integration
Markets
Networks
Regional
Reserve capacity
Wind power
Wind power generation
title Regional Approach to Large Scale Wind Integration in South East Europe
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-26T10%3A31%3A59IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Regional%20Approach%20to%20Large%20Scale%20Wind%20Integration%20in%20South%20East%20Europe&rft.jtitle=Energy%20&%20environment%20(Essex,%20England)&rft.au=Majstrovi%C4%87,%20Goran&rft.date=2015-01&rft.volume=26&rft.issue=1-2&rft.spage=95&rft.epage=109&rft.pages=95-109&rft.issn=0958-305X&rft.eissn=2048-4070&rft_id=info:doi/10.1260/0958-305X.26.1-2.95&rft_dat=%3Cproquest_cross%3E1677984877%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1673399004&rft_id=info:pmid/&rft_sage_id=10.1260_0958-305X.26.1-2.95&rfr_iscdi=true