Schedulability Analysis and Optimal Scheduling of Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation

With wafer residency time constraint of cluster tools in semiconductor manufacturing, activity time variation can make an originally feasible schedule infeasible. Thus, it is difficult to schedule them and schedulability is a vitally important issue. With bounded activity time variation considered,...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on automation science and engineering 2012-01, Vol.9 (1), p.203-209
Hauptverfasser: Wu, N, Zhou, M
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:With wafer residency time constraint of cluster tools in semiconductor manufacturing, activity time variation can make an originally feasible schedule infeasible. Thus, it is difficult to schedule them and schedulability is a vitally important issue. With bounded activity time variation considered, this paper addresses their real-time scheduling issues and conducts their schedulability analysis. A Petri net (PN) model and a control policy are presented. Based on them, this paper derives closed-form schedulability conditions. If schedulable, an algorithm is developed to obtain an offline periodic schedule. This schedule together with the control policy forms a real-time schedule. It is optimal in terms of cycle time and can be analytically computed, which represents significant advance in this area.
ISSN:1545-5955
1558-3783
DOI:10.1109/TASE.2011.2160452