Bi-objective reentrant hybrid flowshop scheduling: an iterated Pareto greedy algorithm
The multi-objective reentrant hybrid flowshop scheduling problem (RHFSP) exhibits significance in many industrial applications, but appears under-studied in the literature. In this study, an iterated Pareto greedy (IPG) algorithm is proposed to solve a RHFSP with the bi-objective of minimising makes...
Gespeichert in:
Veröffentlicht in: | International journal of production research 2014-01, Vol.52 (19), p.5735-5747 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!