Bi-objective reentrant hybrid flowshop scheduling: an iterated Pareto greedy algorithm

The multi-objective reentrant hybrid flowshop scheduling problem (RHFSP) exhibits significance in many industrial applications, but appears under-studied in the literature. In this study, an iterated Pareto greedy (IPG) algorithm is proposed to solve a RHFSP with the bi-objective of minimising makes...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of production research 2014-01, Vol.52 (19), p.5735-5747
Hauptverfasser: Ying, Kuo-Ching, Lin, Shih-Wei, Wan, Shu-Yen
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The multi-objective reentrant hybrid flowshop scheduling problem (RHFSP) exhibits significance in many industrial applications, but appears under-studied in the literature. In this study, an iterated Pareto greedy (IPG) algorithm is proposed to solve a RHFSP with the bi-objective of minimising makespan and total tardiness. The performance of the proposed IPG algorithm is evaluated by comparing its solutions to existing meta-heuristic algorithms on the same benchmark problem set. Experimental results show that the proposed IPG algorithm significantly outperforms the best available algorithms in terms of the convergence to optimal solutions, the diversity of solutions and the dominance of solutions. The statistical analysis manifestly shows that the proposed IPG algorithm can serve as a new benchmark approach for future research on this extremely challenging scheduling problem.
ISSN:0020-7543
1366-588X
DOI:10.1080/00207543.2014.910627