LID-BMPs planning for urban runoff control and the case study in China

Low Impact Development Best Management Practices (LID-BMPs) have in recent years received much recognition as cost-effective measures for mitigating urban runoff impacts. In the present paper, a procedure for LID-BMPs planning and analysis using a comprehensive decision support tool was proposed. A...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of environmental management 2015-02, Vol.149, p.65-76
Hauptverfasser: Jia, Haifeng, Yao, Hairong, Tang, Ying, Yu, Shaw L., Field, Richard, Tafuri, Anthony N.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Low Impact Development Best Management Practices (LID-BMPs) have in recent years received much recognition as cost-effective measures for mitigating urban runoff impacts. In the present paper, a procedure for LID-BMPs planning and analysis using a comprehensive decision support tool was proposed. A case study was conducted to the planning of an LID-BMPs implementation effort at a college campus in Foshan, Guangdong Province, China. By examining information obtained, potential LID-BMPs were first selected. SUSTAIN was then used to analyze four runoff control scenarios, namely: pre-development scenario; basic scenario (existing campus development plan without BMP control); Scenario 1 (least-cost BMPs implementation); and, Scenario 2 (maximized BMPs performance). A sensitivity analysis was also performed to assess the impact of the hydrologic and water quality parameters. The optimal solution for each of the two LID-BMPs scenarios was obtained by using the non-dominated sorting genetic algorithm-II (NSGA-II). Finally, the cost-effectiveness of the LID-BMPs implementation scenarios was examined by determining the incremental cost for a unit improvement of control. •A methodology for LID-BMPs planning using a comprehensive decision support tool was proposed.•A case study was conducted for the LID-BMPs planning at a college campus.•A sensitivity analysis was performed to assess the impact of the hydrologic and water quality parameters.•The optimal solution for LID-BMPs scenarios was obtained by using NSGA-II option.
ISSN:0301-4797
1095-8630
DOI:10.1016/j.jenvman.2014.10.003