Selection of Type of Mating Between Pools at High Dams
Problems that have surfaced in the operation of domestic hydroprojects, for which a mating scheme is adopted for the pools by discharging the flow from the dam, are indicated. Cases when use of a discharge is justified, and the conditions for which the energy of the discharged flow is dissipated on...
Gespeichert in:
Veröffentlicht in: | Power technology and engineering 2013-11, Vol.47 (4), p.258-262 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Problems that have surfaced in the operation of domestic hydroprojects, for which a mating scheme is adopted for the pools by discharging the flow from the dam, are indicated. Cases when use of a discharge is justified, and the conditions for which the energy of the discharged flow is dissipated on stabilization directly beyond the dam is preferable, are indicated. |
---|---|
ISSN: | 1570-145X 1570-1468 |
DOI: | 10.1007/s10749-013-0434-1 |